Tamil Nadu

Climate Action Tracker

Data-Backed, District-Led Blueprint for Climate Action
blue tick Launch Date: 31st October 2025

Action Tracker

Climate Action Insights

Mitigation Potential Overview

This section presents key interventions and their targets for reducing carbon emissions in The Nilgiris district,
with approximate mitigation potential for 2030 and 2050.

Interventions to Mitigate Scope 1 Emissions

Additional Target for Year:
Sr. No. Key Intervention Activity/Target Target for Year 2030 Approximate Annual Mitigation Potential upto 2030 (ktCO2e) Progress Annual Mitigation Realised (ktCO2e) Additional Target for Year 2040 Annual Mitigation Potential upto 2040 (ktCO2e/yr) Progress Annual Mitigation Realised (ktCO2e) Additional Target for Year 2050 Approximate Annual Mitigation Potential upto 2050 (kTCO2e) Progress Annual Mitigation Realised (ktCO2e)
A Decarbonising the Energy Sector
A.1 Shift from Fossil-Fuel to RE based Captive Power Generation Replacing/tying up PPAs from existing ~87 MW fossil-fuel based Captive Power Plants (CPPs) to equivalent renewable energy capacity of ~105 MW (solar, wind and GH2) by 2050. 40% of the existing tied up capacity (equivalent RE capacity 40 MW) 55
(1.62%)
- - 55% additional capacity (equivalent RE capacity ~60 MW) 129
(3.72%)
- - 5% of the balance (equivalent RE capacity 5 MW) 146
(4.13%)
- -
A.2 Use of Electric Cookstove in Cooking Adoption of ~1.4 lakh electric cookstoves in residential cooking by 2050 0.7 lakh 77
(2.27%)
- - 0.2 lakh additional 91
(2.63%)
- - 0.5 lakh remaining 137
(3.88%)
- -
A.3 Use of Biogas using Waste (Livestock waste, Food Scaps etc) Installing a biogas plant of approx 30000 m3/day capacity, considering 50% realization of total potential of 60000 m3/day of the district 40% 22
(0.64%)
- - 10% additional 26
(0.75%)
- - 50% 58
(1.64%)
- -
A.4 Replacement of diesel pumps with solar pumps for irrigation Conversion of 330 diesel pumpsets to off-grid solar pumps by 2030 100% 6
(0.16%)
- - 10% additional 26
(0.75%)
- - NA 6
(0.17%)
- -
A.5 Use of EV tractor and tillers for agriculture land preparation Electrifying ~8000 tractors and tillers by 2050 1,480 5
(0.16%)
- - 3,760 19
(0.55%)
- - 2,760 29
(0.82%)
- -
A.6 Replacement of HSD by Biodiesel in Diesel Generator for Backup Supply / Renewable based Backup Supply Support Replacement of HSD by Biodiesel in Diesel Generator for Backup Supply / Renewable based Backup Supply Support
a. Exploring biodiesel availability production in the district (assessment)
b. Pilot implementation of biodiesel use in commercial DG sets / RE based backup supply support
c. Using biodiesels in all the DG sets in the districts
To be assessed To be assessed To be assessed
B Shift to Electric Mobility The target suggested in below mentioned interventions are over and above the stock in BAU scenario.
B.1 Shift to EV 2 Wheeler Increasing the share of EV in 2W sales to achieve 100% penetration (upto ~5 lakh EV 2W) by 2050 1 lakh 10.41
(0.31%)
- - 2 lakh additional 32
(0.92%)
- - 2 lakh additional 50
(1.41%)
- -
B.2 Shift to EV 3 Wheeler Increasing the share of EV in 3W sales to achieve 100% penetration (~7500 EV 3W) by 2050 1,000 0.1
(0.03%)
- - 3,701 1.9
(0.05%)
- - 7,164 4
(0.11%)
- -
B.3 Shift to EV 4 Wheeler Increasing the share of EV in 4W sales to achieve 100% penetration (upto ~2 lakh EV 4W) by 2050 0.25 lakh 14.95
(0.44%)
- - 1 lakh additional 64
(1.85%)
- - 0.75 lakh additional 103
(2.91%)
- -
B.4 Shift to EV Buses Increasing the share of EV buses in sales and achieving 100% penetration (upto ~ 2000 EV buses) by 2050 200 16
(0.47%)
- - 1100 additional 76
(2.19%)
- - 500 additional 99
(2.8%)
- -
B.5 Shift to electric Heavy Goods Vehicles (HGVs) Increasing the share of electric Heavy Goods Vehicles (trucks, trolleys) in sales to achieve 80% penetration (upto ~2000 EV HGVs) by 2050 100 5
(0.16%)
- - 1200 additional 93
(2.68%)
- - 500 additional 120
(3.4%)
- -
B.6 Creation of EV Charging infrastructure Installation of ~475 charging stations in total by 2050 39 NA - - 166 NA - - 270 NA - -
C Decarbonization of the Industry
C.1 Exploring Electrification of Heating Processes in Industries to Reduce Fossil Fuel Consumption (Furnace Oil, HSD etc) Fully Electrified kiln via plasma generator for heating in industries in place of fossil fuel based heating by 2050 40% of the target 237
(6.97%)
- - 20% additional achievement of the target 392
(10.47%)
- - Remaining 40% of the target 603
(17.06%)
- -
Total Scope 1 Mitigation Potential (ktCO2e) 449.8
(13.23%)
930.2
(25.99%)
1355.1
(25.99%)

Interventions to Mitigate Scope 2 Emissions (Electricity Sector)

Sr. No. Key Intervention Activity/Target Target for Year 2030 Annual Mitigation Potential upto 2030 (ktCO2e/yr) Progress Annual Mitigation Realised (ktCO2e) Additional Target for Year 2040 Approximate Annual Mitigation Potential upto 2040 (kTCO2e) Progress Annual Mitigation Realised (ktCO2e) Additional Target for Year 2050 Approximate Annual Mitigation Potential upto 2050 (kTCO2e) Progress Annual Mitigation Realised (ktCO2e)
A Addition of Renewable Energy (RE) capacity to meet the domestic electricity demand at district level Additional RE capacity integration of ~3 GW (in addition to existing RE capacity of 0.7 GW)
a. Potential Assessment for various RE sources including rooftop solar, utility scale, wind, floating solar, agro PV and others
b. Installation as per assessment
NA 0 - - 1 GW of the RE capacity target 1,533 - - ~2 GW of remaining capacity 4,384 - -
B Energy Efficiency (EE) improvements* Installation of ~7.5 lakh 3/5 star EE ACs in residential spaces to replace old/inefficient ACs 3 lakh 50 - - 4.08 lakh 143 - - 0.46 lakh 154 - -
Installation of 3/5 star EE refrigeration units up to a total of 7 lakh by 2050 6.5 lakh 6 - - 0.5 lakh 7 - - 0.00 8 - -
Replacing existing ~11 lakh incandescent bulbs and CFL bulbs and CFL tubelights with LED in residential space by 2030 8.5 lakh 2 - - 2.5 lakh 6 - - NA 10 - -
Replacing ~0.8 lakh street lights with LED lights by 2030 100% 25 - - NA 25 - - 9 lakh LED bulbs to be installed in the region to replace old lighting stock 25 - -
Adoption of ~7 lakh BLDC fan by 2050 6.3 lakh 2 - - 0.6 lakh 4 - - An additional 0.3 lakh street and public place lights to be replaced between 2030 and 2050 73 - -
C Utilizing biodegradable waste to generate electricity Installation of waste to energy plant of 3 MW (the plant will require ~90 tons waste per day) by 2030 100% 14 - - NA 14 - - NA 14 - -
Total Scope 2 Mitigation Potential (ktCO2e) 85.3 1,718.1 4,586

Non-Energy Interventions

Sr. No. Key Intervention Activity/Target Target for Year 2030 Annual Mitigation Potential upto 2030
(ktCO2e/yr)
Progress Annual Mitigation Realised (ktCO2e) Additional Target for Year 2040 Annual Mitigation Potential upto 2040 (ktCO2e/yr) Progress Annual Mitigation Realised (ktCO2e) Additional Target for Year 2050 Annual Mitigation Potential upto 2050 (ktCO2e/yr) Progress Annual Mitigation Realised (ktCO2e)
D Waste Management in the region
D.1 Domestic Wastewater Management Set up adequate centralized wastewater treatment plants for urban Facility to treat 35 MLD of wastewater 66
1.95%
- - Facility to treat additional 20MLD of wastewater 90
(2.61%)
- - Additional maintenance 45
(2.07%)
- -
D.2 Enhancing decentralized treatment Retrofitting unsanitary septic tanks and unlined holes in the ground with leach pit or twin pit septic tanks at household level for 1,34,750 households - - Retrofitting unsanitary septic tanks and unlined holes in the ground with leach pit or twin pit septic tanks at household level for 57750 households - - Additional maintenance - -
D.3 Setting up Fecal Sludge Treatment Plant (FSTP) at firka level 20 FSTP for 20 firkas - - 19 FSTPs for remaiining 19 firkas - - Additional maintenance - -
D.4 Increase household connections to underground drainage 60% Households to be connected with UGD - - 100 % Households to be connected with UGD - - Additional maintenance - -
D.5 Industrial wastewater management Setting up of Effluent Treatment Plants (ETP) and Contionous Effluent Treatment Plants (CETPs) along with continous treated effluent monitoring system Facility to treat 2 MLD 3
(0.08%)
- - Maintenace and additional facilities as per requirement 5
(0.16%)
- - Maintenace and additional facilities as per requirement 9
(0.25%)
- -
D.6 Solid waste management Dry waste recycling centre 1.20 recycling centres for 20 firkas at village level
2. 1 recycling centre per 1 lakh population (total 10 recycling centres)
0 - - 1. 19 recycling centres for 19 firkas at village level
2. Additional 5 recycling centre (total 15 recycling centres)
1.04
(0.03%)
- - Maintenace and additional facilities as per requirement 1.27
(0.04%)
- -
D.7 Composting Centres 10 composting centre (1 per 1 lakh population) - - 5 additional composting centre ( total 15) - - Maintenace and additional facilities as per requirement - -
D.8 Stakeholder capacity building and awareness generation for holistic sustainable waste management Ongoing initiative - - Ongoing initiative - - Ongoing initiative - -
Total Mitigation Potential of Waste Management 69 (2.03%) 96.04(2.8%) - 101.27 (2.85%) -
E Green Spaces and Carbon Sequestration
E.1 Restoration and conservation of existing forest area and tree cover Maintaining the current carbon stock densities and growth in forest cover to ensure the carbon sequesteration of -170.8 kt CO2e per year Strengthening protection around existing reserved forest areas with additional measures of protection like: strengthening the fencing; eliminating encroachment; levying penalty on defaulters; etc. 170.8
(5.02%)
- - Strengthening protection around existing reserved forest areas with additional measures of protection like: strengthening the fencing; eliminating encroachment; levying penalty on defaulters;etc. 170.8
(4.93%)
- - Strengthening protection around existing reserved forest areas with additional measures of protection like: strengthening the fencing; eliminating encroachment; levying penalty on defaulters;etc. 170.8
(4.83%)
- -
E.2 Promoting social and agroforestry in land classified as barren or fallow, land put to non-agricultural uses of cultivable waste land Social and agroforestry in 35163 ha of land (~14% of 258044 ha) In the subsequent years, continuous monitoring and maintenance of the plantations need to be undertaken 193
5.69%
- - Social and agroforestry in 49228 ha of land (~19% of 258044 ha) In the subsequent years, continuous monitoring and maintenance of the plantations need to be undertaken 658
(18.97%)
- - Social and agroforestry in 56261 ha of land (~22% of 258044 ha) In the subsequent years, continuous monitoring and maintenance of the plantations need to be undertaken 1238
(35.02%)
- -
E.3 Enhancing Carbon stock density Enhancement of carbon stock density by ~2% increase from 82.25 t/ha to 83.75 t/ha 49
(1.43%)
- - Enhancement of carbon stock density by ~4% increase from 82.25 t/ha to 85.26 t/ha 19
(0.56%)
- - Enhancement of carbon stock density by ~5% increase from 82.25 t/ha to 86.76 t/ha 19
(0.55%)
- -
Total mitigation potential of sustainable agriculture practices 413 (12.14%) 848 (24.56%) 1428 (40.04%)
F Sustainable Agriculture Practices
F.1 Promote modern cultivation techniques to optimise agricultural inputs and maximise outputs Use of organic fertilizer and compost in place of urea in agricultural production 15% agriculture area transitioned to organic fertilizer 4.66
0.14%
- - 45% agriculture area transitioned to organic fertilizer 14.31
(0.41%)
- - 75% agriculture area transitioned to organic fertilizer 24.39
(0.69%)
- -
F.2 Use of nano urea in place of urea in agricultural production 30% of urea requiremnt met through nano urea - - 55% of urea requiremnt met through nano urea - - 25% of urea requiremnt met through nano urea - -
F.3 Total - - - - - - - - -
F.4 Capacity building programmes can be conducted through Krishi Vigyan Kendra for creating awareness on climate resilient practices Can be an ongoing initiative - - Can be an ongoing initiative - - Can be an ongoing initiative - -
F.5 - Establish local network of mini weather monitoring stations to monitor rainfall and temperature as well as to be able to forecast extreme weather conditions - this can help inform farmers of appropriate sowing, harvesting and irrigation timings 20 mini weather monitoring stations NA - - 19 mini weather monitoring stations NA - - Additional maintenance - - -
F.6 Emission reduction from rice cultivation Increase the percentage of multiple aeration in the rice cultivated area Increase in multiple aeration from 20% to 27% 4
0.13%
- - Increase in multiple aeration from 20% to 51% 20
(0.57%)
- - Increase in multiple aeration from 20% to 77% by 2050 42
(1.18%)
- -
F.7 Livestock management Feed inputs for livestock - Tamarin plus and Harit Dhara and balanced rationing to reduce methane emissions from enteric fermentation. Implemetation of GOBARdhan scheme for manure maangement Balanced rationing introduced in 30% and improved feed supplemts like Harit Dhara and Tamrin plus in 25% of livestock . 30% reduction in manure managemnt emission through GOBAR dhan scheme 26
0.76%
- - Balanced rationing introduced in 60% and improved feed supplemts like Harit Dhara and Tamrin plus in 50% of livestock . 60% reduction in manure managemnt emission through GOBAR dhan scheme 57
(1.65%)
- - Balanced rationing introduced in 90% and improved feed supplemts like Harit Dhara and Tamrin plus in 75% of livestock . 90% reduction in manure managemnt emisison through GOBAR dhan scheme 93
(2.64%)
- -
Total mitigation potential of sustainable agriculture practices 34.66
(1.03%)
91.31
(2.63%)
159.39
(4.51%)